New Bridge May Hit a Snag

The Folsom Dam Bypass Bridge is currently being “fast-tracked” to a 2007 opening, however a design issue with the Folsom Dam raise project may pose a problem. A new spillway may be needed for the Dam, which would be perilously close the the bridge. Vice Mayor Andy Morin feels the bridge can be modified, however, to accomodate the design issue. Story in the Bee.