New Bridge By ’07
In what is considered a very quick turnaround time, a replacement bridge for the Folsom Dam Road may be built and open by as soon as 2007. Though this is at least 3 years away, this is a short time frame in the scheme of things. The new bridge will be 4 lanes, with bike and pedestrian crossing as well. It is quite contingent on the passing of renewwing Measure A, a tax which has been in place since 1988. Details
* Details from the city
* Doolittle: Open the Dam Road